I've been spending more and more time on the layout lately. It's coming along, but its also a bit behind schedule. I had planned on building two module frames a month, which means I should now have 6 built, but I only have 4. I guess I'll try to get two more built this month.
This is the main passenger station for the Twin Lakes & Western Scenic RR. I'm working on the last few details including: windows, doors, real clocks for the clock tower, and interior / exterior lighting. I also need to do a bit of weathering to the roof.
This is looking down module 2 and module 1. I extended the main road onto module 2, which creates a RR crossing seen at the bottom of the pic. To the left, on the near side of the tracks, will be a drive in movie theater. Farther down on the left will be a KFC, McDonalds, Taco Bell and a Shell Station. Some sort of small light industry will fill the area on the right side of the road.
I painted the roof piece of the tunnel.
The walls of the tunnel are painted black. I've used dark grey in the past, but this time I want it to be dark in the tunnel. Now I need to paint the roadbed and rails, then ballast before closing up the tunnel.
Looking uphill through the tunnel site.