On the module above, my road climbs 4" to a higher level of the town. This is a complex module with tunnels for track and for the road, as well as incline for the road. All of this must be completed before I seal up the hillside.
I used Woodland Scenics 4% grade foam risers for the base of the road, the cut and glued balsa wood for the road surface.
I painted the road too early. I should have waited, but I wanted to verify the color. Anyway, the next step was to install a metal guide wire I each lane of the road. This wire will allow me to run a Faller Car System at a later point. The Faller system is used to animate the cars on the layout, allowing them to drive, stop, turn, etc. I will write more about this later. For now, I marked out the center of each lane, used a Xacto knife to cut a groove in the road, then inserted the guide wire. I used super glue to hold the wire in place, then filled the gap with wood putty. Once it dried, it was sanded and the road was painted.
I have to make sure the guide wire is installed correctly. Once I close up the hill, it will be difficult to access.